Engine test run Engine test run is necessary:
Step
Procedure
1
Operate the engine until the temperatures have stabilized for a period of 5
min. (engine oil temperature between 50 to 70 °C (122 - 160 °F).
2
Switch the engine OFF.
3 Allow the engine to cool down.
4
Check for leaks.
5
Check the coolant level and top up with coolant as required.
12–10–00
Page 6
September 01/2018
Effectivity: 912 i Series
Edition 2/Rev. 0

Table of Contents

Other manuals for Rotax 912 i series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Rotax 912 i series and is the answer not in the manual?

Rotax 912 i series Specifications

General IconGeneral
Number of Cylinders4
Max Power100 hp (73.5 kW)
Max Power Output RPM5800 rpm
Ignition SystemDual electronic ignition
Oil SystemDry sump, forced lubrication with separate oil tank
Reduction Gear Ratio2.43:1
TBO2000 hours
Engine Type4-stroke, horizontally opposed
Displacement1352 cm³
Bore x Stroke84 mm x 61 mm
Max Torque128 Nm
Fuel TypeAvgas 100LL or unleaded automotive gasoline
Fuel SystemElectronic fuel injection
Cooling SystemLiquid/air-cooled