EasyManua.ls Logo

Rottler H85A - Hone Head Maintenance

Rottler H85A
179 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Section 6 Maintenance H85A Manual
www.rottlermfg.com
6-8
Hone Head Maintenance
This procedure should be performed every 40 hours of machine operation or weekly, which ever comes
rst.
1. Remove cone rod (1) from body (3) and clean threads. Lubricate threads with high pressure grease.
2. Check rubber bumper (2) for damage. Replace if damaged.
3. Clean hone head body.(3)
4. Lubricate 4 pivot screws (4) with motor oil.
5. Lubricate feed nut universal (5) with motor oil.
6. Replace cone rod (1) and rubber bumper (2) into hone head body.(3)

Table of Contents

Related product manuals