EasyManuals Logo

Sartorius PR 5211 Series User Manual

Sartorius PR 5211 Series
96 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #9 background imageLoading...
Page #9 background image
PR 5211 Instrument Manual Safety Hints
Sartorius EN-7
1.4.5 Failure and Excessive Stress
If the instrument is suspected of being unsafe, shut it down and protect it against accidental operation. This
is the case when the unit:
- is physically damaged,
- does not function any more,
- is stressed beyond the tolerable limits (e.g. during storage, transport).
1.4.6 Fuse
The instrument has got no fuse to be exchanged. The load cell supply is protected against short circuit by
multifuse elements. If the load cell supply switches off, disconnect the device from power. Search for the
reason and eliminate it. After a cooling down period of about 3 minutes the power can be switched on
again.
1.4.7 EMC-Compliant Installation
- Use only screened data cables.
- Connect screens on both ends with ground.
- Keep unscreened cable ends short.
- Connect screen rail to cabinet / housing with
low impedance.
- Use metal or metallized connector housings.
- Establish equipotential bonding between
instruments/system modules (Mandatory for
Ex-applications).
- Use standard reference potential.
- Connect mounting rail to protective earth.
- Install measure and data cables separately from
power cables.
1
2
3
4
Pos.
Designation
1 Mounting rail (35 mm)
2 Screen clamp (e.g. Phoenix SK8-D)
3 Screen rail (e.g. Phoenix NLS-CU 3/10)
4 Rail connection (e.g. Phoenix AB-SK 65D)

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Sartorius PR 5211 Series and is the answer not in the manual?

Sartorius PR 5211 Series Specifications

General IconGeneral
BrandSartorius
ModelPR 5211 Series
CategoryTransmitter
LanguageEnglish

Related product manuals