EasyManua.ls Logo

SeaSTAR OPTIMUM EPS - Page 22

SeaSTAR OPTIMUM EPS
152 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
© 2014 SeaStar Solutions Optimus Installation Manual, Rev. E
3-2
Networks and Wiring (Section 6)
• Review network diagrams
• Install network tees.
• Connect network harnesses.
• Install circuit breakers and run the power wires.
• Connect ignition wires.
• Connect engine RPM source.
• Connect autopilot if required.
Commissioning (Section 8)
• Installation checks
• Sea trial
• Steering adjustments
• Warranty checklist
Component Installation (Section 5)
• Mount the helm.
• Mount the CANtrak.
• Mount the pump control module (PCM) and the power
steering pumps.
• Install the SmartCylinders.
• Install the remote service valves (if necessary).
• Install the hoses.
Purging, Calibration and Setup (Section 7)
• Purge the hydraulic system.
• Calibrate the SmartCylinders
• System setup with CANtrak.

Table of Contents