EasyManua.ls Logo

Shark MP200 - Page 146

Shark MP200
496 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Doc# E166703 10-16
10: Using the Optional Display
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Electro Industries/GaugeTech
The Leader In Power Monitoring and Smart Grid Solutions
Figure 10.8: Installation Components
2. Insert the display module (along with the tee insert if you are using it) into the
panel hole (see Figure 10.8).
3. Screw the nut using the socket wrench with a torque between 1.2 and 2Nm/10.62
and 17.70 in-lb - see figure below.
Figure 10.9: Attaching the Nut Using the Socket Wrench
(5)
(1) (8)
(7)
1: Display Module (front)
2: Panel with Cutout
3: Display Installation Nut
4: Anti-Rotation Tee

Table of Contents

Related product manuals