EasyManua.ls Logo

Siare Morpheus Series - Preliminary Tests - Introduction

Default Icon
221 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Preparation to use
User’s Manual, DU3310103-MRI / rev.3 - 02.05.2019
6-27
6.4 Preliminary tests - Introduction
The preliminary tests have the aim to verify the correct connection and functionality of
the anaesthesia unit and of all its modules.
Before using the anaesthesia unit on a patient, it is necessary to
perform some of preliminary tests in order to check that the equipment
is properly operating.
The list of preliminary tests is available at the end of the present
chapter.
The preliminary test’s should be performed:
each time the anaesthesia unit is turned ON and used
or whenever a connection is made or an important component is
replaced (valves group, patient circuit, oxygen probe, etc…)
Before test starting with anaesthesia unit MORPHEUS LT/MRI verify that:
it has been prepared for use (cfr. Maintenance - Cleaning, disinfection and
sterilisation)
it has been correctly positioned
all accessories and deviced for correct operation have been predisposed
electric power and gas supplies have been connected
it is used a patient simulator fixed to the terminal of supplied patient circuit.
The patient simulator suggested for tests and checking’s is SIARE
code LS.AB.001 which is equipped with variable compliance and
resistance.

Table of Contents

Related product manuals