EasyManua.ls Logo

Siare Morpheus Series - Verification Activity - SELF TEST

Default Icon
221 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Preparation to use
User’s Manual, DU3310103-MRI / rev.3 - 02.05.2019
6-29
6.4.1 Verification activity - “ SELF TEST “
Position the main power supply main switch in position
I (ON) ;
anaesthesia unit start-up
On the ventilator front panel, verify the electric power supply led;
green led on.
Keep STAND-BY / ON-OFF button pressed for a few seconds to turn
the anaesthesia unit on.
The MORPHEUS LT/MRI anaesthesia unit “ SELF TEST “ phase
starts.

Table of Contents

Related product manuals