Preparation to use
6-30 MORPHEUS MRI
After checks of displays and leds il ventilator proceeds with “ SELF
TEST “ and displays:
• tESt ( execution of electronic test phase)
• 2.5 ( release of installed software )
• 0006 (operation hours)
During the “ SELF TEST “ phase the system verifies
Gas supply Verification of the presence of Air and O
2
supply
pressure
Pressure sensor Verification of pressure sensor operation through control
of PAW reading
Battery Checking on battery power
Oxygen cell Verification of O
2
cells connection in the valves group