Installation
32 FLOWSIC600 · Operating Instructions · 8010458 V2.0 · © SICK MAIHAK GmbH
3.4
Electrical Installation
3.4.1 General information
Pre-requisites
Wiring work (routing and connecting the power supply and signal cables), which is
necessary when installing the FLOWSIC600, is not included in the scope of delivery. The
mechanical installation described in Section
→
3.3 must be completed first. Comply with
the minimum cable specification requirements set out in Section
→
3.4.2.
Cable routing
b
Keep cables in conduits or laid on cable trays to provide protection from mechanical
damage.
b
Observe the permitted bending radiuses (generally, min. six times the cable diameter
for multi-conductor cables).
b
Keep all connections outside of conduits as short as possible.
WARNING: DANGER
b
Always observe the general safety regulations and safety instructions given
in Section 1 when carrying out any installation work.
b
Installation work shall only be carried out by trained staff and in
accordance with the relevant regulations issued by the operating company.
b
Take all necessary precautions to avoid local or plant-specific dangers.