EasyManua.ls Logo

SICK MCS100FT - Page 22

SICK MCS100FT
106 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
22 MCS100FT · Operating Instructions · 8011893 V2-1 · © SICK AG
Preparations for Initial Start-up
Subject to change without notice
Fig. 5 Gas connections on the side and top
1 Lay the sample gas line from the sampling probe to the MCS100FT.
Direction: Electric connection on cabinet side.
Leave excess length of the sample gas line on the sampling probe.
2 Lay the tube bundle cable from the sampling probe to the MCS100FT.
Direction: Any.
3 Provide instrument air supply (specification
p. 100, §9.3 and following), plan an instru-
ment air conditioning system when necessary.
4 Lay gas lines for test gases. Make sure tubes are clean.
5 For MCS100FT with FID-100FT:
Only use analytically pure tubes made of copper or stainless steel for the hydrogen
supply.
Do not contaminate the insides of tubes during assembly
Tube bundle cable of sampling probe
M screw connection M40*1.5 D22-32
Gas and air supplies
M screw connection M16*1.5 D5-10
Sample gas outlet
Screw fitting DN 8/10
Heated sample gas line inlet
Observe the information concerning laying sample gas lines enclosed
with the sample gas lines.
WARNING: Risk of explosions on MCS100FT with FID-100FT
The screw fitting (location depends on application) for hydrogen supply
includes a flow limiter.
The hydrogen inlet has a sticker marked “H
2
”.
Do not modify this screw fitting.
Do not connect the hydrogen supply to any other screw fitting.

Table of Contents

Related product manuals