7SR210 & 7SR220 Commissioning & Maintenance Guide
© 2013 Siemens Protection Devices Limited Page 7 of 82
1.2.3  Test Equipment
Required test equipment is: -
1.  Secondary injection equipment with integral time interval meter
2.  Primary injection equipment
3.  A d.c. supply with nominal voltage within the working range of the relay's d.c. auxiliary supply rating
4.  A d.c. supply with nominal voltage within the working range of the relay’s d.c. binary input rating
5.  Other equipment as appropriate to the protection being commissioned – this will be specified in the
product specific documentation.
The  secondary  injection  equipment  should  be  appropriate  to  the  protection  functions  to  be  tested.  Additional
equipment for general tests and for testing the communications channel is:
Portable PC with appropriate interface equipment: -
6.  Portable PC with appropriate interface equipment.
7.  Printer to operate from the above PC (Optional).
Use of PC to facilitate testing
The  functions of  Reydisp Evolution (see  Settings Guide)  can be  used  during the commissioning tests to  assist
with test procedures or to provide documentation recording the test and test parameters. One method is to clear
both the waveform and  event  records  before each test is started, then, after  the test  upload  from the relay the
settings, events and waveform files generated as a result of application of the test. These can then be saved off to
retain a comprehensive record of that test.
Relay settings files can be prepared on the PC (offline) or on the relay before testing commences. These settings
should be saved for reference and compared with the settings at the end of testing to check that errors have not
been introduced during testing and that any temporary changes to settings to suit the test process are returned to
the required service state.
A copy of the Relay Settings as a Rich Text Format (.rtf) file suitable for printing or for  record purposes can be
produced  from  Reydisp  as  follows.  From  the File menu  select  Save  As, change  the  file  type  to Export
Default/Actual Setting (.RTF) and input a suitable filename.
When testing is  completed the  event  and  waveform records should  be cleared  and the settings file checked  to
ensure that the required in-service settings are being applied.
1.2.4  Precautions
Before electrical testing commences the equipment should be isolated from the current and voltage transformers.
The  current  transformers  should  be  short-circuited  in line  with the  local site  procedure.  The tripping and alarm
circuits should also be isolated where practical. The provision and use of secondary injection test sockets on the
panel simplifies the isolation and test procedure.
Ensure that the correct auxiliary supply voltage and polarity is applied. See the relevant scheme diagrams for the
relay connections.
Check that the nominal secondary current rating of the current and voltage transformers has been correctly set in
the System Config. menu of the relay.
1.2.5  Applying Settings
The relay settings for the particular application should be applied before any secondary testing occurs. If they are
not available then the relay has default settings that can be used for pre-commissioning tests.
Note that the tripping and alarm contacts for any function must be programmed correctly before any scheme tests
are carried out.
Relays feature multiple settings groups, only one of which is active at a time. In applications where more than one
settings group is to be used it may be necessary to test the relay in more than one configuration.
Note.  One  group  may  be  used  as  a  ‘Test’  group  to  hold  test-only  settings  that  can  be  used  for  regular
maintenance testing, eliminating the need for the Test Engineer to interfere with the actual in-service settings in
the normally active group. This Test group may also be used for functional testing where it is necessary to disable
or change settings to facilitate testing.
When  using  settings  groups  it  is  important  to  remember  that  the  relay  need  not  necessarily  be  operating
according to the settings that are currently being displayed.