EasyManua.ls Logo

Siemens SINAMICS S150 - Page 215

Siemens SINAMICS S150
312 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Commissioning
8.6 Procedure for configuring PROFIsafe communication
Safety Integrated
Function Manual, 05/2010, A5E03264275A
215
Creating a safety master
1. Create an F-CPU, e.g. CPU 317F-2, and a drive, e.g. SINAMICS S120 with CU320-2, in
accordance with the hardware installed in HW Config.
To do this, start SIMATIC Manager and create a new project.
Figure 8-13 Creating a new project
2. Create a SIMATIC S300 Station under "Insert".
Figure 8-14 Creating a new station
3. The HW Config tool opens by double-clicking on SIMATIC S300(1), and then on
"Hardware".
Figure 8-15 Calling HW Config

Table of Contents

Other manuals for Siemens SINAMICS S150

Related product manuals