Commissioning
8.6 Procedure for configuring PROFIsafe communication
Safety Integrated
216 Function Manual, 05/2010, A5E03264275A
4. First create a mounting rail ((0)UR) under HW Config in the lefthand window:
From the standard catalog under SIMATIC 300/RACK-300, drag the mounting rail to the
upper lefthand field (the cursor has a "+" character).
Figure 8-16 Creating a mounting rail