December 2007 Page 35
Section 3 - Operation General
3.0 Operation
This section provides the necessary information needed
to operate the aerial platform. It is important that the user
reads and understands this manual before operating
the aerial platform.
3.1 General
In order for this aerial platform to be in good working
condition, it is important that the operator meets the
necessary qualifications and follow the operator’s daily
inspection checklist referred to in this manual.
3.1-1 Operator Qualifications
Only trained and authorized personnel shall be
permitted to operate an aerial platform.
Safe use of this aerial platform requires the
operator to understand the limitations and
warnings, operating procedures and operator’s
responsibility for maintenance. Accordingly, the
operator must understand and be familiar with this
operating manual, its warnings and instructions,
and all warnings and instructions on the aerial
platform.
The operator must be familiar with employer’s work
rules and related government regulations and be
able to demonstrate the ability to understand and
operate this make and model of aerial platform in
the presence of a qualified person.
3.1-2 Operator’s Responsibility for Maintenance
WARNING
Maintenance must be performed by
trained and competent personnel who
are familiar with mechanical procedures.
Death or serious injury could result from
the use of an aerial platform that is not
properly maintained or kept in good
working condition.
The operator must be sure that the aerial platform
has been properly maintained and inspected
before using it.
The operator must perform all the daily
inspections and function tests found in Table 4.6,
even if the operator is not directly responsible for
the maintenance of this aerial platform.
3.1-3 Maintenance and Inspection Schedule
Refer to Service manual for frequent (every 3
months or 150 hours) and annual inspection
details.
The actual operating environment of the aerial
platform may affect the maintenance schedule.
WARNING
Use original or manufacturer-approved
parts and components for the aerial
platform.
NOTE
Refer to Skyjack’s website www.skyjack.com
for latest service bulletins prior to performing
frequent or yearly inspections.
3.1-4 Owner’s Inspections
It is the responsibility of the owner to arrange daily,
quarterly (or 150 hours) and annual inspections of the
aerial platform. Refer to Table 4.6 for recommended
maintenance and inspection areas and intervals. A
record of annual inspection is kept on a label located on
the scissor assembly. Refer to Table 4.3 in this manual.
3

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Skyjack SJ6832 RTE Series and is the answer not in the manual?

Skyjack SJ6832 RTE Series Specifications

General IconGeneral
Working Height38 ft
Platform Height32 ft
Lift Capacity1, 000 lbs
Drive Speed3.5 mph
Gradeability30%
Drive Speed (Stowed)3.5 mph
Maximum Working Height38 ft
Capacity1, 000 lbs
Overall Width68 in
Weight3, 629 kg
Drive Speed (Elevated)0.8 km/h
Turning Radius (Outside)4.27 m
Fuel Tank Capacity45.4 L
Platform Length2.44 m
Platform Width0.76 m
Power SourceDiesel / Electric
Overall Length130 in
Stowed Height (Rails Up)2.08 m
Stowed Height (Rails Folded)1.85 m
Turning Radius (Inside)5 ft