35
GB
NET-VISION 7 - SOCOMEC
shutdown seQuenCe
ON Reversible period
UPS
UPS event (AC failed)
UPS shutdown delay
OFF
ON
Net
Vision
Warning delay
1st warn-
ing delay
Warning
interval
OFF
ON
JNC or
VIRUTAL-
JNV
SW Agent
shutdown
delay
OS
shutdown
AC failed warning messages
Script
execution
OFF
Shutdown countdown
Reversible period:
If the event is removed during this period, the shutdown process is cancelled.
At the end of this period, the NET VISION sends the shutdown command to servers and the
UPS standby control if enabled.
Shutdown delay:
The Shutdown agent can start running scripts or batch les before the OS shutdown.
UPS shutdown delay must be greater than the server’s shutdown time, evaluated as the
shutdown delay set on the agent + OS shutdown itself.