EasyManua.ls Logo

Sony SLV-286EE - @L Motor Assy

Sony SLV-286EE
112 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-6.
L
MOTOR
ASS’Y
(Fig.
3-10)
1)
Remove
the
loading
belt
@
with
it
put
on
the
loading
pulley
®.
(This
is
to
prevent
damage
to
the
belt.)
2)
Remove
the
connector
@.
3)
Remove
two
screws
@
and
remove
the
L
motor
ass’y
@.
[Precautions
on
remounting]
©
When
installing
the
L
motor
ass’y
Q,
put
the
loading
belt
@
on
the
loading
pulley
®
(Fig.
A).
O
Install
the
L
motor
ass’y
@
so
that
the
L
motor
label
is
on
the
front
side.
©
Take
care
that
the
loading
belt
is
free
from
twist
and
dirt.
@
Connector
@L
motor
ass'y
Screw
(3X4)
Loading
belt
3-7.
DRUM
ASS’Y
(Fig.
3-11)
1)
Remove
the
cleaning
lever
ass’y
as
instructed
in
Section
3-3.
2)
Remove
the
DM
lead
wire
@.
3)
Remove
three
screws
@
and
remove
the
drum
ass’y
@
in
the
arrow
direction.
[Precautions
on
remounting]
Do
not
to
touch
the
tape
contact
surfaces
of
the
head
chip
®
and
drum
ass’y
@
directly
by
fingers
and
tooling.
©
When
tightening
screws
@,
take
care
to
prevent
screws
from
projecting
and
slanting.
©
Take
care
to
avoid
bent
and
damage
of
the
DM
lead
wire
oe.
O
When
inserting
the
lead
wire
terminal
®
into
the
board
connector
©,
ensure
that
the
terminal
is
firmly
inserted.
©
The
tightening
torque
for
screw
@
should
be
7500g*crn.
[Adjustment
after
replacement]
©
Perform
tape
path
adjustments
as
described
in
4-1.
@
Screw
(3X10)
Screw
(3X10)
®
Terminal
e
@
DM
lead
wire
B
Drumass’y
©
Board
connector

Table of Contents

Related product manuals