82 V 1.3 © Studer-Innotec SA next3 Tech manual
Solar priority without grid feeding: zero export solar backup
Answers in the Wizard:
Grid: YES without grid
feeding
Genset: NO
Cycle battery: NO
Default behaviour:
Energy is never sent back
to the grid.
Solar is used for the loads
during the day and to fill
the battery, and excess is
lost
OFFGRID installation (back feeding on genset is forbidden!):
Answers in the Wizard:
Grid: NO
Genset: YES, on AC-
source
Cycle battery: NO
Default behaviour:
Energy is never sent back
to the genset.
As soon as the genset is
ON, the batteries are
charged.
Solar is used in priority for
the loads during the day
During operation, all the limits and constraints are automatically managed by the NX3. Power
production and storage is optimally dispatched in the system due to the OPFD technology
(Optimal Power Flow Dispatcher).