EasyManua.ls Logo

Sungrow SH10RT - Page 62

Sungrow SH10RT
166 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
50
step 1 Prepare the cable and OT/DT terminal.
(1) Heat shrink tubing (2) OT/DT terminal
After being crimped, the OT terminal must wrap the wires completely, and the
wires must contact the OT terminal closely.
When using a heat gun, protect the device from being scorched.
step 2 Remove the screw on the grounding terminal and fasten the cable with a screwdriver.
step 3 Apply paint to the grounding terminal to ensure corrosion resistance.
- - End
6 Electrical Connection User Manual

Table of Contents

Other manuals for Sungrow SH10RT

Related product manuals