EasyManua.ls Logo

Sungrow SH3K6 - Page 95

Sungrow SH3K6
118 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
User Manual 10 Appendix II: LCD Operation
87
Grid
Contactor
OFF mode
DO relay
ON1
COM1
Inverter
DO port
Fig. 10-3 DO Operation in ON/OFF Control
Optimized Control
The system will control the load operation according to the power optimization
algorithm of energy management.
During the setting interval, the DO function will be
enabled to power on the load if the excess PV energy
exceeds the optimized power.
When the existing system is enabled, the upper limit
of optimized power is the sum of the rated power of
the hybrid inverter and the rated power of the
existing PV system.
Once the optimized mode is enabled, the DO relay
will not disconnect until 20 minutes after the DO
connection.
Load Control
Timer
ON/OFF
Optimized
Start time
End time
09:00
09:30
Optimized P2/2
Power [W] 01000
Take 09:00 am09:30 am and the optimized power of 1000 W as an example.
3000W
2000W
1000W
Charging
PV generation
Grid
Contactor
09
:
00
am
09
:
30
am
DO relay
ON1
COM1
Inverter
DO port
Fig. 10-4 DO Operation in Optimized Control

Table of Contents

Other manuals for Sungrow SH3K6

Related product manuals