OPERATION & MAINTENANCE MANUAL SWE155F
4.5 MACHINE MAINTENANCE
INTERVAL
4.5.1 Daily Maintenance (Every 8 Hours)
Carry out following maintenance operation
before starting machine daily (every 8 hours):
4.5.1.1 Lubricating Work Equipments
(1) boom cylinder foot, 2 places
(2) boom foot pin ( 2 places)
(3) boom cylinder piston rod end (2 places)
(4) arm cylinder foot pin(1 place)
(5) boom – arm connecting pin ( 2 places)
(6) arm cylinder piston rod end (1 place)
(7) bucket cylinder foot pin (1 place)
(8) arm –link connecting pin( 1 place)
(9) arm – bucket connecting pin( 1 place)
(10) link connecting pin( 2 places)
(11) bucket cylinder piston rod end.(1 place)
(12) bucket – link connecting pin( 2 places)