EasyManua.ls Logo

Suzuki DL650K5 - Page 31

Suzuki DL650K5
701 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PERIODIC MAINTENANCE 2-9
Remove the generator cover plug
1 and timing inspection
plug
2.
Turn the crankshaft to set the No.1 (Front) cylinder at TDC of
compression stroke. (Align the “F | T” line on the generator
rotor to the index mark of valve timing inspection hole and
also bring the camshafts to the position as shown in page
2-8.)
To inspect the No.1 (Front) cylinder valve clearance, use a
thickness gauge between the tappet and the cam. If the clear-
ance is out of specification, adjust it into the specified range.
$ 09900-20803: Thickness gauge
Turn the crankshaft 270 degrees (3/4 turns) to set the No.2
(Rear) cylinder at TDC of compression stroke. (Align the
“R | T” line on the generator rotor to the index mark of valve
timing inspection hole and also bring the camshafts to the
position as shown in page 2-8.)
Inspect the No.2 (Rear) cylinder valve clearance as the same
manner of No.1 (Front) cylinder and adjust the clearance if
necessary.
$ 09900-20803: Thickness gauge
F
R
PartShark.com
877-999-5686

Table of Contents

Related product manuals