EasyManua.ls Logo

Suzuki DL650K5 - Remounting

Suzuki DL650K5
701 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7-56 CHASSIS
REMOUNTING
Remount the swingarm in the reverse order of disassembly and
removal. Pay attention to the following points:
SWINGARM
Insert the swingarm pivot shaft and tighten it to the specified
torque with the special tool.
! Swingarm pivot shaft: 15 N·m (1.5 kgf-m, 11.0 lb-ft)
$ 09944-28320: Hexagon bit 19 mm
Hold the swingarm pivot shaft
1 with the special tool and
tighten the swingarm pivot nut
2 to the specified torque.
$ 09944-28320: Hexagon bit 19 mm
! Swingarm pivot nut: 100 N·m (10.0 kgf-m, 72.5 lb-ft)
Tighten the swingarm pivot lock-nut to the specified torque
with the special tool.
$ 09940-14940: Swingarm pivot thrust adjuster socket
wrench
! Swingarm pivot lock-nut: 90 N·m (9.0 kgf-m, 65.0 lb-ft)
PartShark.com
877-999-5686

Table of Contents

Related product manuals