EasyManua.ls Logo

Suzuki VL800 - Page 461

Suzuki VL800
639 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
VL800K5 (’05-MODEL) 14-109
Install the O-ring and dust seal to each fuel injector.
Apply thin coat of the engine oil to the new O-ring and cushion
seal.
#
Install the fuel injectors
3 by pushing them straight to each
throttle body.
#
Install the fuel delivery pipes
4 to the throttle body assembly.
#
Tighten the fuel delivery pipe mounting screws to the speci-
fied torque.
* Fuel delivery pipe mounting screw:
3.5 N·m (0.35 kgf-m, 2.45 lb-ft)
Apply thin coat of the engine oil to the new O-rings.
#
Replace the O-ring and cushion seal with the new
ones.
Never turn the injector while pushing it.
Never turn the fuel injectors while installing them.
Replace the O-rings wi h the new ones.

Table of Contents

Other manuals for Suzuki VL800

Related product manuals