ENGINE
3D-16
11.Install and tighten the upper and lower radiator
hoses. Secure the hoses with clamps.
12.Clean and install the battery and hold down
clamp. Install the positive battery clamp first and
then the negative clamp.
13.Purge air from the fuel system.
14.Using the instructions in the Safety and Operator’s
manual and the manufacturer’s manual, start the
engine. Use the new engine break-in procedures if
installing a new engine.