Theimplement/chargepump(P2)ispartofthepiston(traction)pumpassembly.
Theimplement/chargepumpisdesignedtosatisfytheneedsoftheliftcylinder
(andsteeringcylinderonmodel08745machines)simultaneouslyatfullspeed
throttle.TheImplement/ChargePump(P2)FlowandCircuitReliefTest
comparesuidowatNoLoadwithuidowUnderLoad.Adropinowunder
loadofmorethan20%indicatestheinternalcomponentsofthepumphave
worn.Continuedoperationwithawornpumpcangenerateexcessiveheatand
causedamagetothesealsandothercomponentsinthehydraulicsystem.
Onmodel08743machines,thecircuitreliefvalveispartofremotemanifoldnear
theliftvalve.Onmodel08745machines,thereliefvalveforthesteeringandlift
circuitisintegratedintothesteeringcontrolvalve.
Ifbothsteeringandliftoperationsperformpoorly,performtheimplement/charge
pump(P2)owtestandthecircuitreliefvalvetest.
SpecialEquipmentRequired:
•Flowmeterwithpressuregaugethathasatleasta16liter/minute(5
gallons/minute)capacity.
•1or2hydraulictesthoses
TestProcedure
1.Parkthemachineonalevelsurface,loweranyattachments,engagethe
parkingbrake,andsetthekeyswitchtotheOFFposition.
2.ReadandadheretotheinformationprovidedinT estingtheHydraulicSystem
(page5–23).
3.Removethecentershroud.
4.Cleanthettingandthehydraulichoseontherightsideofthehydraulic
pumpshown;refertoFigure39.
g355240
Figure39
1.Elbowttingathydraulicpump
2.Hydraulichose
5.Disconnectthehydraulichoseandinstallthetesterbetweentheexposed
ttingandthedisconnectedhose.Makesurethetesterisinstalledinthe
SandPro
®
3040and5040
Page5–41
HydraulicSystem:TestingtheHydraulicSystem
20251SLRevA