EasyManua.ls Logo

Toshiba BMS-CT5121E - Confirming and Changing the Content of Schedules Registered in the Running Schedule Screen

Toshiba BMS-CT5121E
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
23-
EN
TOUCH SCREEN CONTROLLER for Air Conditioning Control System Owner's Manual
[7] Confirming and changing the content of schedules registered in the Running Schedule
screen
You can confirm and change the content of a schedule that is registered for each air conditioner up to a week from the present.
(1) Tap the group icon <1> for the schedule that you want to confirm or change.
(2) Tap [Operating Schedule]
<2>.
The Operating Schedule Settings screen appears.
(3) Tap the [Date] tab
<3> for the schedule that you want to confirm or change.
(4) Tap the "Air Conditioner"
<4> for the schedule details that you want to confirm or change.
(5) Tap the [Edit] button
<5>.
The Operating Schedule Detailed Settings screen appears.
(6) Tap the time
<6> and the setting contents <7> that you want to confirm or change.
Changing the schedule turns the colour of the air conditioner's name and the schedule gauge to pink on the Operating
Schedule Settings screen.
The procedure to create a schedule is the same as for the master schedule.
<3><3>
<4><4>
<2><2>
<1><1>
<5><5>
<6><6> <7><7>
[Running Schedule screen]
[Operating Schedule Settings screen]
[Operating Schedule Detailed Settings screen]

Table of Contents

Related product manuals