CDHH-SVX003C-EN
3
WARNING
Follow EHS Policies!
Failure to follow instructions below could result in
death or serious injury.
• All Trane personnel must follow the company’s
Environmental, Health and Safety (EHS) policies
when performing work such as hot work,
electrical, fall protection, lockout/tagout,
refrigerant handling, etc. Where local
regulations are more stringent than these
policies, those regulations supersede these
policies.
• Non-Trane personnel should always follow local
regulations.
Note: Graphic labels (shown above) are used for CE
application only.
Important:
• Before servicing, disconnect all power
sources and allow at least 30 minutes for
capacitors to discharge.
• All electrical enclosures—unit or remote—
are IP2X.
WARNING
Refrigerant May Be Under Positive
Pressure!
Failure to follow instructions below could result in an
explosion which could result in death or serious
injury or equipment damage.
System contains refrigerant and may be under
positive pressure; system may also contain oil.
Recover refrigerant to relieve pressure before
opening the system. See unit nameplate for
refrigerant type. Do not use non-approved
refrigerants, refrigerant substitutes, or non-approved
refrigerant additives.
WARNING
Replace Manual in Cabinet After Use!
Failure to replace this Installation, Operation, and
Maintenance manual in cabinet after use could
prevent personnel from accessing necessary safety
information and could result in death or serious injury
or equipment damage.
NOTICE
Do Not Use Non-Compatible Parts or
Materials!
Use of non-compatible parts or materials could result
in equipment damage.
Only genuine Trane® replacement components with
identical Trane part numbers should be used in Trane
CenTraVac chillers. Trane assumes no responsibility
for damages resulting from the use of non-compatible
parts or materials.
Factory Warranty Information
Compliance with the following is required to preserve the
factory warranty:
All Unit Installations
Startup MUST be performed by Trane, or an authorized
agent of Trane, to VALIDATE this WARRANTY. Contractor
must provide a two-week startup notification to Trane (or an
agent of Trane specifically authorized to perform startup).
Additional Requirements for Units Requiring
Disassembly and Reassembly
When a new chiller is shipped and received from our Trane
manufacturing location and, for any reason, it requires
disassembly or partial disassembly, and reassembly—
which could include but is not limited to the evaporator,
condenser, control panel, compressor/motor, economizer,
purge, factory-mounted starter or any other components
originally attached to the fully assembled unit— compliance
with the following is required to preserve the factory
warranty:
• Trane, or an agent of Trane specifically authorized to
perform start-up and warranty of Trane® products, will
Introduction