EasyManua.ls Logo

Trane CVHH - Page 104

Trane CVHH
111 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
We are committed to using environmentally
conscious print practices that reduce waste.
Trane optimizes the performance of homes and buildings around the world. A business of Ingersoll Rand, the leader in
creating and sustaining safe, comfortable and energy efficient environments, Trane offers a broad portfolio of advanced
controls and HVAC systems, comprehensive building services, and parts. For more information, visit www.Trane.com.
Trane has a policy of continuous product and product data improvement and reserves the right to change design and specifications without notice.
This document and the information in it are the property of Trane, and may not be used or reproduced in whole or in part without written permission. Trane reserves
the right to revise this publication at any time, and to make changes to its content without obligation to notify any person of such revision or change.
All trademarks referenced in this document are the trademarks of their respective owners.
6. Testing
Dry nitrogen available for pressure testing (for
disassembled units)
Material and equipment available for leak testing, if
necessary
7 .
Refrigerant on job site and in close proximity to chiller
Total amount in cylinders: _______ (specify lb or kg) Number of cylinders: _____
Size of cylinders: _____ (specify lb or kg)
8.
Systems can be operated under load conditions
9.
Electrical, cont rol man, and contractor’s representat ive are available to evacuate, charge, and t est t he
CenTraVac under serviceman’s supervision
10.Equipment room
Does the equipment room have a refrigerant monitor/
sensor capable of monitoring and alarm ing within the
allowable exposure level of the refrigerant?
Does the equipment room have proper mechanical
ventilation?
Does the installation have properly placed and
operating audible and visual refrigerant alarms?
If it is required by local code, is a self-contained
breathing apparatus available?
11. Owner awareness
Has the owner been fully instructed on the proper use
and handling of refrigerant?
Does the owner have a copy of the MSDS for
refrigerant?
Note: Additional time required to properly complete the start-up and commissioning, due to any incompleteness of the
installation, will be invoiced at prevailing rates.
This is to certify that the Trane
®
equipm ent has been properly and completely installed, and that the applicable items listed
above have been satisfactorily completed.
Checklist completed by (print name): _____________________________________________________________________________
Signature: _____________________________________________ Date: ______________________________
In accordance with your quotation and our purchase order number __________________ , we will therefore require the
presence of Trane service on this site, for the purpose of start-up and commissioning, by __________________ (date).
Note: Minimum two-week advance notification is required to allow scheduling of the chiller start-up.
Additional comments/instructions:
_______________________________________________________________________________________________________________
_______________________________________________________________________________________________________________
_______________________________________________________________________________________________________________
_______________________________________________________________________________________________________________
_______________________________________________________________________________________________________________