Rev. 5
3-3
INSPECTION DESCRIPTION
PRE-INSPECTION / POST-INSPECTION
Perform the preliminary systems check and engine run-up. The Rotax line
maintenance manual provides the run-up procedure for the engine. Test all of the
engine systems and controls. Test all of the airframe systems and controls. Make note
of any abnormalities or dysfunctional components. Record the applicable values in the
spaces given on the Inspection Checklist. After the systems check, proceed with the
following:
1. Remove the left and right wing.
2. Remove all access covers, inspection plates, fairing and cowling shown in
Figure 4.
3/8 socket
#2 Phillips screwdriver
♦ Clean rags
♦ Straight edge (avoid scratches; tape
along one edge)
♦ Small square
♦ Screwdrivers:
#2 Phillips
♦ Socket:
3/8
♦
♦ Compression tester
♦ Torque wrench (in/lbs & ft/lbs)
♦ Tire pressure gauge
♦ Jack
♦ Padded stands
♦ Step ladder
♦ Flashlight
♦ Magnifying Glass
♦
Wing Retention Pin Bushing Gauge
LWAYS SUPPORT THE FLAPERON DURING WING REMOVAL AND