Page #46 background image
Rev. 5
3-10
FUSELAGE
Tools
Magnifying glass
Flashlight
Inspection mirror
Clean rag
Straight edge
Inspect the exterior of the
fuselage skins and fasteners.
Check the fasteners by sighting
along each rivet pattern for any
inconsistent rivet profile among
properly installed rivets as
shown in Figure 6.
Figure 6: Rivet Inspection
Critical areas are where the firewall attaches to the fuselage, each wing spar mates
with the fuselage, the tailcone attaches to the forward fuse, and the empennage
components attach to the tailcone.
Visually inspect that both of the static ports are clear.
Test the condition and security of the left and right boarding steps.
Inspect the condition of the electrical connections that correspond to the wing. The
connections must be free of corrosion and any damage.
Inspect the inside diameter of each flaperon torque tube for rust/corrosion and verify
that the UHMW plastic spacers are in place in the actuating arms of the flaperon
torque tubes.

Table of Contents

Other manuals for Van's Aircraft RV-12

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Van's Aircraft RV-12 and is the answer not in the manual?

Van's Aircraft RV-12 Specifications

General IconGeneral
BrandVan's Aircraft
ModelRV-12
CategoryAircrafts
LanguageEnglish

Related product manuals