EasyManua.ls Logo

vc999 K7 - Servicing Work

vc999 K7
121 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Vacuum Packaging Machine VC999 K7
Maintenance
2008-11-26 Art.-No. 592.016 Page 83/121
11.2 Servicing work
Maintenance on the operational machine is performed to ensure trouble-free operation. Operating mes-
sages on the display indicate to the user at an early stage what maintenance must be performed. These
messages are described in chapter 9.13 "Operating messages".
We recommend having the Vacuum Packaging Machine fully serviced at least once a year by the
manufacturer's customer services. The VC999 Customer Service Dep. is ready and available for any
other servicing work at any time.
CAUTION
Risk of crushing. Before undertaking servicing work, always switch the Vacuum Packaging
Machine off first, and make sure that the machine cannot be switched on again inadvertently.
Overview of maintenance
Task
Frequency
Documentation
Carry out general servicing work every 2,000 operating hours
Check sealing bars, replace Teflon tape
and sealing wire
every 4,000 packaging cycles
Chapter 11.2.2.1
"Replace Teflon tape and
sealing wires"
Oil change on vacuum pumps
Rotary slide vacuum pump
Roots vacuum pump
According to instructions
See separate user man-
ual of the pump manufac-
turer under the "Vacuum
pump" index tab

Table of Contents

Related product manuals