EasyManuals Logo

Vertiv NetSure 8200 Series Installation Manual

Vertiv NetSure 8200 Series
198 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #30 background imageLoading...
Page #30 background image
Vertiv | NetSure8200 Series -48 VDC Power System Installation Manual (IM582140000) | Rev. A
30
Figure 11:
Bolting Power/Distribution Bay to Distribution Only Bay
1st D
ist
ribution Only Bay
ASSEMBLED V
IEWS
B
usb
ar
Pla
tes
1
. Sli
de b
usbar be
twe
en
e
xis
tin
g busbar p
lat
es.
2. Install
these busba
rs.
3. Install
bolts and h
ardwar
e six places (
hand-t
ight).
1/2-13 x 2” Bolts,
1/2” Belleville Lock Washer,
Busbars
Bay Preparation
A. Remove rear cover panels.
B. Remove s
ide panels on sides of bays
that will be palced next to each other.

Table of Contents

Other manuals for Vertiv NetSure 8200 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Vertiv NetSure 8200 Series and is the answer not in the manual?

Vertiv NetSure 8200 Series Specifications

General IconGeneral
BrandVertiv
ModelNetSure 8200 Series
CategoryPower Supply
LanguageEnglish

Related product manuals