EasyManuals Logo

Vertiv NetSure 8200 Series Installation Manual

Vertiv NetSure 8200 Series
198 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #40 background imageLoading...
Page #40 background image
Vertiv | NetSureā„¢ 8200 Series -48 VDC Power System Installation Manual (IM582140000) | Rev. A
40
Figure 20:
Installing Power/Distribution Bay to Power/Distribution Bay Negative and Positive Busbar Links
(Lists 102 and 112, w/ List 130 or 131)
Busb
ar Link
Cover S
hield
(
install
ed afte
r
all mo
unting
and ele
ctrical
conn
ection
procedur
es
are compl
eted)
Slide Bus
bar
Link
s Un
der
Bays'
Upri
ght C
hann
els
.
Us
e Bol
t Hole
s as
Show
n
in I
llustra
tio
n.
T
orq
ue to 18
0 in-lbs
.
3/
8-16
x 1-
1/
2
" Bo
lt
3
/8"
Bel
le
vil
le L
ock
Wash
er
3/8
" Be
lle
vi
lle
Loc
k Wa
sher
(c
onca
ve s
ide
of Be
lle
vil
le
L
ock
Wash
ers
fac
e ea
ch ot
her
)
3/
8ā€ H
ard
ened
Fla
t Wa
she
r
(1
0 Pla
ces
per
Bus
bar)
POS
ITI
VE
B
USB
AR LI
NK
N
EGAT
IVE
BUS
BAR
LIN
K

Table of Contents

Other manuals for Vertiv NetSure 8200 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Vertiv NetSure 8200 Series and is the answer not in the manual?

Vertiv NetSure 8200 Series Specifications

General IconGeneral
BrandVertiv
ModelNetSure 8200 Series
CategoryPower Supply
LanguageEnglish

Related product manuals