EasyManua.ls Logo

Volcano CORE Mobile - Volcano-Certified Maintenance

Volcano CORE Mobile
148 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
300004969171/B Page 115 of 148
3. Carefully observe electrostatic discharge (ESD) precautions.
Cable Inspection
Check placement of PIM cable and connector, and ensure cable is protected from
accidental damage
Inspect cable connections to ensure secure connections
Volcano-Certified Maintenance
Volcano-certified maintenance is performed by Volcano-certified service engineers only.
A comprehensive inspection, operational check, entire system test, and check of any
installed options are required.

Table of Contents