EasyManua.ls Logo

WAGNER PROTEC 95-150 - 7 Operation; Training the Operating Personnel; Emergency Stop; Tasks

WAGNER PROTEC 95-150
88 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
38
VERSION 01/2020
ORDER NUMBER DOC2340282
IceBreaker 150-300 cm
3
7 OPERATION
7.1 TRAINING THE OPERATING PERSONNEL
The operating personnel must be qualied to operate the entire system.
The operating sta must be familiar with the potential risks associated with
improper behavior as well as the necessary protective devices and measures.
Before work commences, the operating personnel must receive appropriate system
training.
7.2 EMERGENCY STOP
A Open
B_07670
3
2
A
A
B
B
B Closed
In the case of unforeseen occurrences:
Close ball valve (2);
Open return valve (3).
7.3 TASKS
Ensure that:
commissioning is carried out in accordance with Chapter 6.7.
A Open
B_07671
5
6
4
1
3
7
2
B
B
A
A
B Closed
1. Visual check: personal safety
equipment, grounding and all
devices ready to use.
2. Secure spray gun and insert
nozzle into the spray gun.
3. Close return valve (3).
4. Slowly open the ball valve (2).
5. Set required working pressure
on the pressure regulator (1).
6. Optimize spray pattern in
accordance with the spray gun's
operating manual.
7. Start work process.

Table of Contents

Related product manuals