47
VERSION 01/2020
ORDER NUMBER DOC2340282
IceBreaker 150-300 cm
3
8.2.6 CLEANING AND REPLACING THE HIGHPRESSURE FILTER
1. Flush the pump and HP lter in accordance with Chapter 7.5, and
while doing so:
12
11
10
7
2
3
5
B_05427
1
21
Filter installation position
Preferred Turned over
Filter
identication
Mobilux EP2**
Anti-seize paste**
53MPa; 530bar; 7687psi
B_05275
B_05276
– At the preferred lter installation position: Flush via the
return valve (1). This produces a large ow. As a result, the
ushing agent also ows through the upper part of the lter
cartridge (11). Pressure regulator approx. 0.15MPa; 1.5bar;
22psi.
– With a reversed lter installation position: Flush using
the spray gun. This is required, in the case of a reversed
installation position, so that the ushing agent ows
through the lter cartridge (11). Maximize the ow (remove
the nozzle, open the dosing valve if necessary).
2. Empty the pump in a controlled manner in accordance with
Chapter 8.2.4.
3. Place the grounded collection tank under the high-pressure lter.
4. Open ball valve (1).
5. Loosen union nut (3) with a size 70 wrench.
6. Unscrew the union nut (3) and lift slightly so that it does not get
dirty in the next step.
7. Remove the lter housing (2) with the union nut (3). The cone
spring (12) remains in the lter housing (2). If the O-ring (5) is not
damaged, it remains on the lter housing (2).
8. Remove the lter cartridge (11) and lter socket (10) from the
lter housing (2).
9. Clean all parts:
– Place the lter cartridge (11) and lter support (10) in
solvent. Clean using brush.
– Fill the lter housing (2) approx. 1/3 full with solvent. Close,
wearing a glove, and shake well.
– Clean the distribution housing (7) using a brush.
10. If necessary, replace the O-ring (5) and/or lter cartridge (11).
Order no., see Chapter 14.8.
11. Assemble all parts in reverse order. While doing so:
– Coat the thread of the distribution housing (7) with anti-
seize paste**.
– Coat the O-ring (5) and pressure ring (21) with Mobilux
EP2**.
– Observe the installation position of the lter cartridge (11):
Push the closed end with the lter identication ahead into
the lter housing (2).
– Make sure that the cone spring (12) is in the lter housing
(note the installation position). Press on the cone spring
after inserting the lter cartridge (11) and lter support (10);
the spring action must be noticeable.
– Tighten the union nut (3) by hand.
12. Close ball valve (1).
13. Fill the pump in accordance with Chapter 8.2.5.
** Order no., see Chapter 10.5.