60
23.2 Replacement modules
23.2.1 Replacement of 5PS, 5IO, 5ML and 5SM modules
1. Disconnect the 230 V and the batteries.
2. Wait until the display has completely turned off before removing the module.
3. Insert the replacement module.
4. Turn on the 230 V and connect the batteries.
5. The system will be ready again after approx. 2 seconds.
23.2.2 Replacement of 5MC module
1. Save a backup of the configuration on a USB stick (recommended) or the build in SD-Card and make a note of the CAN-address, if
necessary please see section 14.17 or 14.18.
2. Disconnect the 230 V and the batteries.
3. Wait until the display has completely turned off before removing the module.
4. Insert the 5MC replacement module.
5. Insert the USB stick or the SD-card from the old 5MC module into the new module.
6. Turn on the 230 V and connect the batteries.
7. Enter the CAN-address
8. Load the parameters from the USB stick / SD card.
9. The system will be ready again after approx. 2 seconds.
If the 5MC module, which is to be replaced, is completely without function then do straight to point 2.
If there is no backup of the configurations, these are to be entered manually.
It is therefore recommended to take a backup, on a USB stick (recommended) or on the built in SD card, when the panel is running, if
necessary please see section 14.17 or 14.18.
24 Declaration of Conformity and CE certificate
The smoke ventilation panels are manufactured and tested accordingly to the European requirements.
The total system is not to be put into service until a declaration of conformity for the total system has been made.
The “Declaration of Conformity” and the EN certificate are supplied with panel as separate documents.