January 2016
2-69
WorkCentre WorkCentre 4150/4250/4260WorkCentre 4150/4250/42604150/
09-320, 330, 340, 600, 09-400
Status Indicator RAPs
4265 Checkout
NOTE: The main PWB has test points. The location of the test points is shown on the Main
PWB PJ location illustration.
Refer to Wiring Diagram 39. Perform the following:
1. Check that the xerographic module, PL 9.10 Item 1 is installed correctly.
2. Check the wiring between the xerographic module connector, PL 4.15 Item 35 and CN22
in the Main PWB.
3. Install new components as necessary:
• Xerographic module, PL 9.10 Item 1.
• Xerographic module connector, PL 4.15 Item 35.
4. Perform the OF5 Main PWB Check RAP.
09-400 Replace Drum RAP
09-400 The xerographic module has reached the end of the design life of 55,000 (4150) or
80,000 (4250/4260) print pages.
Procedure
WARNING
Switch off the electricity to the machine. Disconnect the power cord from the customer
supply while performing tasks that do not need electricity. Electricity can cause death or
injury. Moving parts can cause injury.
Go to the relevant procedure:
• 4150 Checkout
• 4250/4260 Checkout
• 4265 Checkout
4150 Checkout
NOTE: The main PWB has test points. The location of the test points is shown on the Main
PWB PJ location illustration.
Refer to Wiring Diagram 5. Perform the following:
1. Install a new xerographic module, PL 9.10 Item 1.
2. Check the wiring between the xerographic module connector, PL 4.15 Item 17 and CN11
on the Main PWB. If necessary, install a new xerographic module connector, PL 4.15 Item
17.
3. If necessary, install new xerographic module, PL 9.10 Item 1.
4. Perform the OF5 Main PWB Check RAP.
4250/4260 Checkout
NOTE: The main PWB has test points. The location of the test points is shown on the Main
PWB PJ location illustration.
Refer to Wiring Diagram 23. Perform the following:
1. Install a new xerographic module, PL 9.10 Item 1.
2. Check the wiring between the xerographic module connector, PL 4.15 Item 35 and CN11
on the Main PWB. If necessary, install a new xerographic module connector, PL 4.15 Item
35.
3. If necessary, install new xerographic module, PL 9.10 Item 1.
4. Perform the OF5 Main PWB Check RAP.
4265 Checkout
NOTE: The main PWB has test points. The location of the test points is shown on the Main
PWB PJ location illustration.
Refer to Wiring Diagram 39. Perform the following:
1. Install a new xerographic module, PL 9.10 Item 1.
2. Check the wiring between the xerographic module connector, PL 4.15 Item 35 and CN22
on the Main PWB. If necessary, install a new xerographic module connector, PL 4.15 Item
35.
3. If necessary, install new xerographic module, PL 9.10 Item 1.