EasyManuals Logo

Xinje DS3 series servo User Manual

Xinje DS3 series servo
41 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #3 background image
DS3 series servo manual
1
►► Safety notes
Confirmation after get the products
If servo drive is missing parts, broken, type wrong, please do not install it.
Installation
Cut off all the power before installation.
Wiring
Cut off all the power before wiring.
Connect the AC power to the power terminals on the servo drive.
Do not connect output terminal U, V, W of servo drive to 3-phase power.
Ground the servo drive with 2mm
2
cables.
Running and maintenance
Please install the panel guard when power on.
Do not touch the terminals within 5 minutes after power off.
Do not connect servo drive with loader when test-running.
After connect to the loader, please set suitable parameters before running.
Do not change the wiring when power on.
Do not touch the radiator when running.
►► Product arrival confirmation
1. Confirm the product as the following items.
Item Remark
The product type is accord with the
ordered one
Please confirm the label of servo drive and motor
Servo motor rotation axis is turning well Can turn by manual. Cannot turn with brake
Is the product broken? Please check if there is broken because of
transportation
Is the screw loose? Check the screw with screw driver
Motor code
Check the motor code on servo drive and motor, if
they are the same
If there is inconsistent item, please contact XINJE sales department.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Xinje DS3 series servo and is the answer not in the manual?

Xinje DS3 series servo Specifications

General IconGeneral
BrandXinje
ModelDS3 series servo
CategoryServo Drives
LanguageEnglish

Related product manuals