DS3 series servo manual 
1 
►► Safety notes 
  Confirmation after get the products 
  If servo drive is missing parts, broken, type wrong, please do not install it.   
  Installation 
  Cut off all the power before installation. 
  Wiring 
  Cut off all the power before wiring. 
  Connect the AC power to the power terminals on the servo drive. 
  Do not connect output terminal U, V, W of servo drive to 3-phase power. 
  Ground the servo drive with 2mm
2
 cables. 
  Running and maintenance 
  Please install the panel guard when power on. 
  Do not touch the terminals within 5 minutes after power off. 
  Do not connect servo drive with loader when test-running. 
  After connect to the loader, please set suitable parameters before running. 
  Do not change the wiring when power on. 
  Do not touch the radiator when running. 
 
►► Product arrival confirmation 
1.  Confirm the product as the following items. 
Item  Remark 
The  product  type  is  accord  with    the 
ordered one 
Please confirm the label of servo drive and motor 
Servo motor rotation axis is turning well  Can turn by manual. Cannot turn with brake 
Is the product broken?  Please  check  if  there  is  broken  because  of 
transportation 
Is the screw loose?  Check the screw with screw driver 
Motor code 
Check the motor code on servo drive and motor, if 
they are the same 
If there is inconsistent item, please contact XINJE sales department.