EasyManua.ls Logo

YASKAWA iC9000 Series - Page 44

YASKAWA iC9000 Series
138 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
44
3.2 Installing the iC9200
(a) Proceeding
1. Mount the mounting rail! Please consider that a clearance from the middle of the mount-
ing rail of at least 105mm above and below exists.
And consider a clearance of at least 10 mm horizontally from the CPU (and SLIO) on
either side.
2. Pull the locking brackets downward, place the CPU at the mounting rail and push the
brackets upward.
If you want to use the CPU without periphery modules, you can wire it now.
(2)
Assembly Possibilities
Horizontal hanging:

Table of Contents

Related product manuals