JOHNSON CONTROLS
12
FORM 102.20-N1
ISSUE DATE: 7/06/2016
SERVICE TASK REFERENCE
SERVICE TASK REFERENCE
Air Filters 94
Installing a 2 in. Pleated Filter 98
Installing a 4 in. Pleated Filter 98
Installing a Single Headered (SH) Filter 99
Installing a 2 in. Pre-Filter Combined with a
SH Final Filter 99
Installing a Multi-Cell SBM Double Headered
(DH) Filter 100
Installing a 2 in. and 4 in. Pre-Filter Combined
with a DH Final Filter 101
Air Measuring Device Connections 56
Assembling the Solution XT End Channel
Shipping Split 45
Assembling the Johnson Controls
Provided Curb 26
Clearance and Mounting for Indoor AHUs 28
Coil Piping 74
Staggered Coils 74
Hot and Chilled Water Coils 75
Water Treatment 77
Condensate Drain Arrangement 61
Drains and Traps 89
Condensate Drain Piping 89
Elevating AHU for Gravity Floor Drain
Connections 90
Duct Connections 91
Duct Connection Guidelines 91
Flanged Duct or Sleeves 91
Raw or Straight Edge Duct or Sleeves 91
Sound and Vibration Transmission 92
General Electrical Information 65
HEPA Filters 103
Hot Gas Bypass (HGBP) 87
Inspection, Damage, and Shortage 22
Receiver's Responsibility 23
Shipped Loose Parts 23
Installing Ceiling Suspended AHUs 29
Installing Damper Actuator 48
Installing Multi-Zone (MZ) Dampers 51
Installing Field Supplied MZ Damper Actuators 52
Installing External Vent Piping for Outdoor
AHUs 61
Installing Hood with Moisture Eliminator 49
Installing Indoor Solution XT AHU 39
Installing an Solution XT AHU with Expanded
Cabinet 39
Installing Outdoor AHU 36
Single Piece 36
Multi-Piece 36
Installing Pipe Chase 57
Tools and Materials 57
Apply Gaskets 57
Attach the Pipe Chase 58
Install Cover Angles 59
Install Base Rail Covers 60
Installing Tiered AHU 43
Long Term Storage 22
Piping Connections 73
Power Connections 65
Single Point Power 65
Wiring the Gas Heat Device 67
Wiring the Electric Heat Device 68
Electric Humidier 72
Humidier 72
Lights for Solution XT AHUs 73
Preparing the Site 25
Proper Lifting with Shackles 24
Refrigeration 83
DX Direct Expansion Coils 83
Available Coil Arrangements 85
Rigging 23
Indoor and Outdoor AHUs 23
Shipped Loose Parts 23
Short Term Storage 23
Thermostatic Expansion Valves (TXV) 87
Tools Required to Install AHU 32
UVC Emitter Lamps 51
Two Types of Lamps 51
VAV System 89
VIFB and IFB 79
Shipping Bolts 79
Visual Control Filter Clamps 104