EasyManua.ls Logo

YSI 2900 - Linearity Test; Results

YSI 2900
166 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
33
5.1.2 Linearity Test
13. Pour small amount of linearity standard in a test tube or multi-well plate.
14. Touch additional sample locations to create new batch for the linearity tests.
15. For the daily linearity checks, select only the chemistry that corresponds to the linearity standard in that sample
location.
16. Touch
to save the batch.
17. Create additional batches for each linearity solution.
18. Touch [Close] when all batches are created.
19. Load the plate/rack in the sampling station 1.
20. Touch [Start] to run the FCN and the linearity standards as samples.
The analyzer will calibrate as required and run the batches.
5.1.3 Results
21. Touch the Results tab
22. Select a sample location.

Table of Contents

Related product manuals