EasyManua.ls Logo

Zünd G3 - Checklist

Default Icon
108 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Initial commissioning
98
13.5 Checklist
Name of the test point (chapter) Note/adjusting value
S-box, electronics unit
- The rotary switch of the safety relay in the S-box has the
setting "6".
- Bridge plug in the S20 slot on ACS_BF_BOARD is
removed.
11.3 Checking the pillar deflection
- Front left X/Y direction
- Rear left X/Y direction
- Rear right X/Y direction
- Front right X/Y direction
11.4 Checking the light curtain (with test piece)
- Front
- Left
- Rear
- Right
Comment
Place, date Signature of technician
Place, date Signature of customer

Table of Contents

Related product manuals