Setting up the control panel/workstation
13
5 Setting up the control panel/workstation
5.1 Dismantling the existing control panel/workstation
Whether the control panel / workstation needs to be dismantled from the cutter depends on whether
the control panel / workstation is already free or still attached to the cutter. If the control panel /
workstation must be moved, the cables need to be extended. An extension set is available for this
purpose.
The signal light is optional and must only be connected if it is present.
Control panel Workstation