7. Attach the conductive sleeves to the cable shields with cable ties. Tie up the unused
conductive sleeves with cable ties.
8. Connect the twisted shields of the cables to the PE busbar of the cabinet.
9. Connect the phase conductors of the input cable to the L1, L2 and L3 terminals.
(With 12-pulse connection, the terminals are 1L1, 1L2 and 1L3 for one 6-pulse supply
line, 2L1, 2L2 and 2L3 for the other.) See Use of fasteners in cable lug
connections (page 135). Tighten the screws to the torque given under Tightening
torques (page 248).
10. Reinstall the shrouding removed earlier.
11. Close the cubicle door.
134 Electrical installation