EasyManua.ls Logo

ABB CRB 1300 - Page 414

ABB CRB 1300
726 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
Screw: M4x8 12.9 Lafre
2C2B/FC6.9 (2 pcs)
Refit the connector plate.4
Tightening torque: 2.6 Nm
xx2000001542
Routing the cable package in the tubular
NoteAction
Screw: M4x8 12.9 Lafre
2C2B/FC6.9 (2 pcs)
Refit the second semicircular bracket to the tubu-
lar.
1
Tightening torque: 2.6 Nm
xx2000001749
Route the cablings.
Leave the CP/CS connectors and motor
connectors out from the tubular support,
and Ethernet connectors and air hoses out
from the process hub.
The air hoses are facing upside in the
semicircular bracket.
2
Refitting the lamp unit
Notice that the procedure is valid only when the lamp unit needs a replacement.
NoteAction
Multi-color lamp unit (16 mm):
3HAC081993-004
Refit the lamp unit.1
xx2200001003
Continues on next page
414 Product manual - CRB 1300
3HAC083111-001 Revision: B
© Copyright 2022-2023 ABB. All rights reserved.
5 Repair
5.5.2 Replacing the housing and extender unit
Continued

Table of Contents

Related product manuals