EasyManua.ls Logo

ABB CRB 1300 - Page 427

ABB CRB 1300
726 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Separating the cable package from the tubular
NoteAction
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
xx2000001748
Remove the first semicircular bracket that fixes
the cable package.
2
xx2000001749
Remove the second semicircular bracket from the
tubular.
3
Removing the process hub
NoteAction
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
xx2200001000
Remove the screws and carefully open the cover.
CAUTION
There is cabling attached to the cover. The cover
cannot be removed completely until the connect-
ors are removed.
2
Continues on next page
Product manual - CRB 1300 427
3HAC083111-001 Revision: B
© Copyright 2022-2023 ABB. All rights reserved.
5 Repair
5.5.3 Replacing the tubular and tilt unit
Continued

Table of Contents

Related product manuals