EasyManua.ls Logo

ABB CRB 1300 - Page 471

ABB CRB 1300
726 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Refitting the axis-5 timing belt
NoteAction
xx2000001595
Install the timing belt to the pulleys and verify that
the belt runs correctly in the grooves of the pul-
leys.
1
Used belt: 59.3-63.4 HzMove the motor to achieve proper belt tension.2
New belt: 70.8-74.3 Hz
Use a sonic tension meter to measure the timing
belt tension.
3
If the timing belt tension does not meet the require-
ment, loosen the motor screws and readjust.
Tightening torque: 6 NmSecure the motor with the screws.4
xx2000001594
Routing the cable package in the tubular
NoteAction
Screw: M4x8 12.9 Lafre
2C2B/FC6.9 (2 pcs)
Refit the second semicircular bracket to the tubu-
lar.
1
Tightening torque: 2.6 Nm
xx2000001749
Route the cablings.
Leave the CP/CS connectors and motor
connectors out from the tubular support,
and Ethernet connectors and air hoses out
from the process hub.
The air hoses are facing upside in the
semicircular bracket.
2
Continues on next page
Product manual - CRB 1300 471
3HAC083111-001 Revision: B
© Copyright 2022-2023 ABB. All rights reserved.
5 Repair
5.5.3 Replacing the tubular and tilt unit
Continued

Table of Contents

Related product manuals