EasyManua.ls Logo

ABB CRB 1300 - Page 544

ABB CRB 1300
726 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NoteAction
xx2000001593
Remove the tubular covers.2
Loosening the process hub
NoteAction
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
xx2000001538
Remove the screws and carefully open the cover.
CAUTION
There is cabling attached to the cover. The cover
cannot be removed completely.
2
Loosening the cables in the tubular
NoteAction
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
1
xx2100001483
Cut the cable strap.2
Continues on next page
544 Product manual - CRB 1300
3HAC083111-001 Revision: B
© Copyright 2022-2023 ABB. All rights reserved.
5 Repair
5.6.6 Replacing the axis-6 motor
Continued

Table of Contents

Related product manuals