EasyManua.ls Logo

ABB CRB 1300 - Page 591

ABB CRB 1300
726 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Securing the cable package in the lower arm
NoteAction
Screw: M4x8 12.9 Lafre
2C2B/FC6.9 (2 pcs on the cable
package and 2 pcs on lower arm)
Refit the cable bracket.1
Tightening torque: 2.6 Nm
xx2100001465
xx2000001553
Routing the cable package in the housing
NoteAction
Plastic cable protector, axis 4:Slip the axis-4 cable protector over the cable
package.
1
3HAC064694-001:
xx2000001570
xx2000001571
Insert the cable package through the hollow tube
of the axis-4 gearbox, into the extender unit (only
for CRB 1300-7/1.4 and ) and into the tubular.
Make sure that:
the air hoses are facing the axis-3 gearbox
side in the hollow tube of axis-4 gearbox.
CAUTION
Make sure that no cables or hoses are twisted or
strained. Reroute if necessary.
2
Continues on next page
Product manual - CRB 1300 591
3HAC083111-001 Revision: B
© Copyright 2022-2023 ABB. All rights reserved.
5 Repair
5.7.2 Replacing the axis-2 gearbox
Continued

Table of Contents

Related product manuals